Southern Freight Line (SFL)
Began in 2010, 31km line between Leightonfield – Macarthur, $310M in cost, Swetha provide protection officers, handsignallers and track certifiers.




Kingsgrove to Revesby Quadruplication Alliance (K2RQ)
Began in 2007, part of the Clearways Program, 2 additional 7.5km tracks between Kingsgrove – Revesby, Swetha supplied 250 qualified and professional staff and 50 protection officers and handsignallers, $800M in cost.


Glenfield to Leppington
11.4km of track, 20 set stabling yard, 14 bridges, $2.1B in cost, completed in 2014


Richmond Line Duplication
Part of the Clearways Project, $260m in cost, began in 2008, Swetha supplied protection officers to the project


ARTC South Improvement
Swetha established depot at Wagga Wagga, Swetha trained 20 local staff in safeworking, $1.1M in cost, 220 km of passing loops.




South West Rail Link
Began in 2009, Swetha managed the worksite safety for a period of 4 years, Swetha supplied track certifiers, protection officers, handsignallers and Planning Officers, coordinate work between MacMahon, NovaRail, RailCorp and TfNSW, No incident was recorded for the duration of the project.

Hunter 8 Alliance
Maitland to Whittingham third track project, 29 km of track, $281M in cost, Swetha provided safeworking staff for both stages of the project

Novo Rail
Is an alliance of RailCorp in partnership with Aurecon, Laing O’Rourke and ODG, Swetha has worked with NovaRail on ATP project and the LGCUP programme, Swetha provided protection officers to these projects.




Epping to Chatswood Rail Link (ECRL)
Began in 2002, consists of 12.5km of track, Swetha was involved for 7 years on this project, completed in 2009, Swetha supplied all protection officers, handsignallers and track certifiers




North Sydney Station Upgrade
TIDC engaged to upgrade station, $88M in cost, transformed station into larger open facility, easy access for passengers, Swetha supplied all safeworking staff



CCTV Project
Greater customer security for 2000 Olympics and beyond, project undertaken by Phillips, then Tyco, Swetha supplied all safeworkingfor a period of 3 years, 301 stations equipped with cameras



CityRail Station Sparkle
Paint a selected number of CityRail stations, project done before 2000 Olympics, enhance station environment for overseas visitors, project undertaken by Dept of Public Works, Swetha supplied all safeworking for project.




CityRail Station Re-roofing
Repair hail damaged roofing on stations, structural improvements were also carried out, Swetha supplied all safeworking staff to project for a period of 8 months

Electrification – Illawarra Region
Fluor Australia was awarded maintenance contract for the CityRail Illawarra region, undertook the electrification from Kiama to Nowra, Swetha supplied all the safeworking staff for a period of 3 years

Energy Australia
High voltage project between Wolli Creek-Arncliffe, Swetha supplied all safe working staff, also prepared risk assessments, track awareness training and inductions




Bondi Junction Turnback Project
Baulderstone Hornibrook awarded contract to build Bondi Junction Turnback Project, Swetha supplied all safeworking staff for the project, work was done on a 24/7 basis maintain operation through the Christmas and New Year period




Sydney Harbour Bridge Fencing
The Bridge caters for 4 types of daily transport-car, train, pedestrian and cyclist, RTA aaproved the assembly of security fencing, project was undertaken in 2006 for a few months



Albury-Wodonga Road Link
RTA was granted approval to upgrade the roadway between Albury-Wodonga, Swetha provided protection staff and track inspection services to Abigroup



Turnback Project – Leighton Contractors Pty Ltd
High voltage project between Wolli Creek-Arncliffe, Swetha supplied all safe working staff, also prepared risk assessments


De-commission of Sydney Signal Complex to Strathfield Signal Complex
Major works done over a weekend where Sydney Control was decommissioned, ATRICS system commissioned for Strathfield Control, Swetha provided rail safeworking for the project Wickham Junction Interchange & Stabling Yard: Project undertaken by Laing 0’Rourke to upgrade Wickham Junction, Swetha provided rail safeworking services for the project




Re-signalling
Downer EDI were engaged to manage a number of large rail projects in regional NSW, Swetha became involved at Dubbo, Bathurst, Moss Vale, Orange, Junee and Parkes, re-railing took place on southern NSW, re-cabling of signaling in the western region

SAI Project (Wagga Wagga to Albury
O’Donnell Griffen awarded contract to upgade signaling in souther regional NSW, Swetha provided rail safeworking to the project

Queensland Rail
A Commonwealth Games initiative, Roma St, Robina, Milton resignalling, Swetha provided all rail safeworking for project

Sandgate:
John Holland engaged by ARTC to undertake Sandgate project, project was commissioned to upgrade trackwork and infrastructure, secure train movements for the secure dispatch of coal to ports, Swetha provided safeworking staff where work took place in the transporting areas